This £1.35m project for Surrey County Council involved the demolition of an existing traveller site and construction of an entirely new facility.

The works had to be planned carefully to protect the history high pressure national gas and oil pipeline network running through the site. Works comprised six new kitchen and bathroom utility buildings and caravan park, including:

• Removal of existing services
• New drainage
• New service connections
• Foundations for new utility blocks
• Site wide roads
• Tarmac pitches for caravans