Expansion of facilities to cater for two additional form entries per annum

Greenshaw High School is a secondary school academy operating under a recently established multi academy trust, with 1670 pupils currently on it’s roll.

This project will deliver the design and construction of a new 2000m2, three storey brick-clad extension building and remodel the existing school in several phases to facilitate this expansion plan.

Our works included:

  • Piling mat installation
  • Piling & pile caps
  • Drainage
  • Suspended ground floor slab
  • Hollow rib decking and suspended concrete floor slabs to the steel frame